Interview

( All the pictures are for reference only)
Thank you very much for your inquiry. We are pleased to offer you as follows on basis of our general enclosed terms and conditions of delivery and sale.
1.
|
Project evaluation 1.1Main commercial terms
1.2 Raw material & Final product:
Raw material | PP、PE、PA |
Final product & Output capacity | ID10--OD58mm Pipe, Max: 80kg/h (Depends on pipe size & formula) |
Operation direction | From right to left (face to the operation panel) |
Machine color | Depend on customer |
1.3 Energy consumption
Cooling Water | 60L |
Compressedair | 0.4Mpa- 0.6Mpa, 0.2m3/min |
Labour | 1-2 Persons |
Remark: Cost of material for trial is paid by customer;
1.5 Spare part list
No. | Name | Qty. | application |
1 | Tools | : 1 set |
Machine |
2 | Die head heating ring | : 1 pc | |
3 | Nozzle | : 2 sets |
Mold |
4 | Mold | : 3 pairs | |
5 | Air plug | : 1 set | |
6 | Guide rod | : 2 sets |
2. Technical data
No. |
Machine |
Technical specifications |
| ||
1 |
Extruder (OG-SJ65) | A: Screw: —Screw Diameter: ¢65mm —L/D: 28:1 —Materials: nitride alloy steel (38CrMoAlA) —Screw speed: 6-90 r/min —Output: 80kgs/h —Screw is suitable for extrusion process with PP/PE/PA materials. |
B: Barrel —Material:38CrMoAlA — Inner Surface treatment: nitriding —Barrel heating: 4 zones 4*4KW —Barrel temperature range: 50-300 ℃ —Cooling system: Air cooling |
C: Gearbox —Reduction gears:173 model, Surface hardened gear —Gear Materials: 38CrMOALA
D:Drive system — Motor: 22KW 380V/50HZ/3P —Frequency changer: Detal
E: Control system —Winpark Temperature Controller —Schneider Contactor —Potentiometer for screw speed regulation —Digital screw speed indicator —Digital motor ammeter —START and STOP buttons —One emergency stop button
F: Technical requirement —To separate safety system into two different systems —Centre-height: 1000mm —Language: Chinese and English —Extruder main color: commercial gray —Alarm indication lamp and sound —Electric cabinet mounted on extruder —Size:L2800*W1200*H1800 —Weight:1200kg | ||
2 |
Die head |
|
—Dies set Material: 40Cr | ||
3 |
Corrugator (OG 58-Ⅰ/72) |
|
A: Forming machine guide rail for mould blocks moving |
—Guide rail material for mould: nitriding 38CrMoAl —The general length of guide rail ensures to run 72 pairs of mould blocks. —Water cooled mould blocks’ guide rail; —Temperature reaction for “guide plates”; —The forming machine guide plate should be water-cooled with enough flow to ensure the temperature of the cuff as it exits the Forming machine is no higher than 55 degrees when run at maximum speed
B: Drive System —Main motor: Zhejiang Xinling —Motor Power: 3KW 380V/50HZ —Reducer: Duplex
C. Lubrication System —Manually or automatically control the lubrication pump —Automatic control lubrication system with opportunity to adjust lubrication time and lubrication interval;
D. Control system —Delta PLC —Delta Frequency changer —Weinview Touch screen —Schneider Relay —Current indicator —Total production counter; —Button for speed —Quick start and stop button —Alarm display —One emergency stop button
E: Safety devices — Cylinder: 1 set — When the forming mold is jammed, the forming machine will be automatically driven away from the extruder and shut down automatically.
F: Technical requirement —Tubing diameter: 10-55mm —Running speed: 0-20 m/min —Emergency stop: Pneumatic ejection —To separate safety system into two different systems. —Centre-height: 1000mm |
—Manually adjustable center height; —Manually operated Forming machine travel to move Forming machine to or away from extruder head; —Manually adjustable center to right and left side —Language: Chinese and English; —Forming machine main color – blue. —Alarm indication lamp and sound; —Control panel mounted on the Forming machine base; —Size:L2100*W970*H1200 —Weight:1200kg | ||
4 |
Single-station Winder(OG-SJ-1) |
|
—Pipe diameter ¢4.5‐¢40 ㎜ —Speed: 0‐25m/min —Motor power : 0.75KW —Reel inside diameter:200mm —Reel width: 200‐270mm adjustable —Reel height: 250mm —Exit way: Pneumatic exit —Main electrical element: Schneider —Frequency changer:Delta —Size:L1200*W1100*H1300 —Weight:300kg | ||
5 |
Mold |
|
—Mold material: 40cr (Nitriding treatment) —Mold size: 36×56.5×75 mm —Molds’ cavity manufacturing according to drawing of flextube from customer —One mold set(Any one size from 10mm to 55mm) —Sizing block: 70pairs |
A: Screw: —Screw Diameter: ¢55mm —L/D: 28:1 —Materials: nitride alloy steel (38CrMoAlA) —Screw speed: 6-90 r/min —Output: 60kgs/h —Screw is suitable for extrusion process with PP/PE/PA materials. | ||
B: Barrel —Material:38CrMoAlA — Inner Surface treatment: nitriding —Barrel heating: 4 zones 4*4KW —Barrel temperature range: 50-300 ℃ —Cooling system: Air cooling | ||
C: Gearbox —Reduction gears:173 model, Surface hardened gear —Gear Materials: 38CrMOALA | ||
6 |
Extruder (OG-SJ55) | D:Drive system — Motor: 22KW 380V/50HZ/3P —Frequency changer: Detal |
E: Control system —Winpark Temperature Controller —Schneider Contactor —Potentiometer for screw speed regulation —Digital screw speed indicator —Digital motor ammeter —START and STOP buttons —One emergency stop button | ||
F: Technical requirement —To separate safety system into two different systems —Centre-height: 1000mm —Language: Chinese and English —Extruder main color: commercial gray —Alarm indication lamp and sound —Electric cabinet mounted on extruder —Size:L2800*W1200*H1800 —Weight:1200kg |
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l Specifications and functions of the machine match the content of this contract.
l Electrical, mechanical and control systems run smoothly.
l Run out sample products as required.
l Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

Copy product links