900型双层八线热封冷切制袋机
Model 900 double-layer eight-wire hot-sealing cold-cutting bag-making machine
NO. | Name | MODEL | Quantity (SET) | Unit price (USD) | Total price (USD) |
Main machine | |||||
1 | Plastic film cutting machine | OG-HD900-8 | 1 | ||
TOTAL PRICE: | |||||
Note: | |||||
1) Customer Voltage and Frequency: 380V/50HZ, 3 Phase | |||||
2) Appendix 1: technical data; appendix 2: components brand list | |||||

本机用途:适合生产HDPE/LDPE平口袋 背心袋
Application: suitable for HDPE/LDPE flat pocket, vest bag
本机特点:
FEATURES:
1. 电脑自动控制,自动计数及可设定计数报警,高效率,节省人力和时间;
Computer automatic control, automatic counting and alarm can be set counting, high efficiency, saving manpower and time
2. 从卷膜到成品袋,是全自动一次性完成;
From the film to the finished bag, is fully automatic one-time completion
3. 步进电机定长,光电跟踪,准确、平稳,送料采用光电控制;
Stepper motor fixed length, photoelectric tracking, accurate, stable, feeding using photoelectric control
4. 采用热封冷切装置, 智能式温度控制系统使袋口封合牢固、平整;
Adopt heat seal cold cutting device, intelligent temperature control system to make the bag mouth sealed firmly and smooth
5. 主机采用变频器控制调速;
The main engine adopts frequency converter to control speed regulation
6. 可配冲口机使用。
Can be used with punch machine
制袋机配置
Bag making machine configuration
型 号 Model number | 900型双层八线 Model 900 double-decker Eight-wire | 电器 Electrical appliances | 正泰 Zhengtai |
最大制袋宽度 Maximum bag width | 170X8 | 电脑 Computer | 中信 CITIC |
最大制袋长度 Maximum bag length | 1500mm | 色标光电眼 Color-coded photoelectric eye | 龙游 Longyou |
生产速度 Rate of production | 30-150个/分钟 30-150/min | 送料光电眼 Feeding photoelectric eye | 龙游 Longyou |
裁切厚度 Cutting thickness | 0.01mm-0.10mm | 温控仪 Temperature Controller | 余姚YKC Yuyao City. YKC |
外形尺寸(L×W×H) Dimension (L × W × H) | 2300×1450×1900 | 烫刀 Scalding knife | 黄铜 煅打平口背心双用烫刀 Brass, calcined flat vest dual-use hot knife |
主电机 Main motor | 上海力超1.5kw Shanghai power surpasses 1.5 kw | 切刀 Cutter | 900mm,马鞍山合金钢 900mm, Maanshan alloy steel |
变频器 Frequency converter | 德弗1.5kw Dever 1.5 kw | 静电箱 Static box | 16kv |
送料电机 Feed Motor | 直流400wX8 DC 400wX8 | 静电棒 Electrostatic Rod | 900mm3根 900 mm 3 roots |
主送料 Main feed | 步进电机 stepper motor | 打孔器 Punch | |
放料轴 Discharge shaft | 8条 Article 8 |
配件工具:弹簧50条,油枪一把,变频器说明书一份,电脑说明书一份,开口扳手1个,内六角一付,十字螺丝刀,一字螺丝刀等。
Accessories tools: Spring 50, oil gun, a frequency converter manual, a computer manual, open wrench 1, hexagonal one pay, cross screwdriver, word screwdriver, etc. .
ARTICLE 2: PAYMENT METHOD
FOB CHINA
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.
E-mail