OG-HD55/75-1250
1000MM Stretch film line Quotation sheet
—Line speed:150m/min,the output is 2.5-3 tons /day
|
|
| |
| |
| |
The photos are for your reference only!
II. Simple information of the machine
No. | Item | Specs |
1. | Model: | OG-HD55/75-1250 |
2. | Industrial Power Supply: | 380 V/50 HZ/3 Phases or customized |
3. | Total Installation Power: | 75 KW (for the machine only) |
4. | Main Raw Material: | LLDPE, LDPE & MLLDPE |
4. | Thickness of Film: | 10~50 microns |
5. | Width of the Useful Film: | 1 roll*1000 mm/2 rolls*500 mm/2 rolls*450 mm |
6. | Film Layer Structure: | AB two layers or ABA three layers |
7. | Designed Linear Speed: | 150 M/Min |
8. | Extrusion Output: | 80~150 kg/h depend on the film thickness |
9. | Dimensions (L×W×H): | 7.5*3*3 M (for reference only) |
10. | Gross Weight: | 8000 KGS (for reference only) |
The technical data of standard OG-HD55/75-1250 2/3 layers cling film machine
● Feeding system
1) 2 sets of 300G automatic loaders.
2) 2 sets of hoppers.
● Extruders
Extruder A (cling layer, screw diameter: 55 mm) is composed of:
1) 1 set of 15 KW AC motor.
2) 1 set of 15 KW variable frequency drive (it is also called inverter or drive).
3) 1 set of coupling with rubber type element is used to connect the motor and the gear box.
4) 1 set of 146# gear box.
5) 1 set of 55 mm diameter 38CrMoAlA alloy screw with good nitrogen treatment. Effective screw L/D=30 D.
6) 1 set of 38CrMoAlA alloy barrel. Heating system: aluminized band heaters. Designed heating power: 12 KW.
7) 1 set of connector where the 100 mesh screen/filter is installed. The screen change is done by manual.
2) Extruder B (screw diameter: 75 mm) is composed of:
1) 1 set of 22 KW AC motor.
2) 1 set of 22 KW variable frequency drive (it is also called inverter or drive).
3) 1 set of coupling with rubber type element is used to connect the motor and the gear box.
4) 1 set of 173# gear box.
5) 1 set of 75 mm diameter 38CrMoAlA alloy screw with good nitrogen treatment. Effective screw L/D=30 D.
6) 1 set of 38CrMoAlA alloy barrel. Heating system: aluminized band heaters. Designed heating power: 15 KW.
7) 1 set of connector where the 100 mesh screen/filter is installed. The screen change is done by manual.
● Feed block
1) 2 sets of two and three layers feed block equipped with AB and ABA runner block.
●T-die
1) OG-HD brand manual adjustment T-die.
2) T-die width: 1250 mm.
3) Material: high quality mould steel.
4) Processing: quenching and tempering, grinding the inside surface;
5) Polished mirror surface and hard chrome plating treatment.
6) Designed heating power: 20 KW.
7) T-die gap: around 1 mm.
8) The film width is adjustable by using the external block (metal bars).
● Film edge pinning device
1) 1 sets of electrostatic film edge pinning device is used to pin the film edges steadily
● Cooling and form part:
1) 1 piece of primary cooling roller: diameter 420 mm. With shiny and smooth surface.
2) 1 piece of secondary cooling roller: diameter 420 mm. With shiny and smooth surface.
3) Both roller are equipped with universal copper water joints.
4) Chain wheels and double row chains are used as part of the conveyor system.
5) 1 set of light rails are installed under the part for easy frontward and backward movements (controlled by electricity power).
● Oscillation system
1) Equipped with 2 pieces of film expanding rollers.
2) Powered by a 120W DC motor.
● Winding part:
1) 1 piece of 420 mm diameter take-up guide roller with shiny and smooth surface.
2) 1 piece of 420 mm diameter winding roller with frosted surface.
3) 2 pieces of rubber-coated roller to provide the pressure the film attached to the roller surface.
4) 1 set of hidden cutting saw and equipped with pneumatic drive to coil the first circle of film onto the paper cores.
5) The automatic film cutting and roll change are controlled by Mitsubishi PLC.
6) 3 pieces of 3” outer diameter W-shape air shafts.
7) Maximum winding diameter: 300 mm. Weight = 35 KGS/roll at 500 mm film width.
8) Chain wheels and double row chains are used as part of the conveyor system.
● Film edge and trim treatment which is composed of:
1) 1 set of OG-HD 142 film crusher.
2) 1 set of automatic re-feeder.
3) There is no wastage during the production, all the film edges and trim are crushed, recycled and reused in the bigger extruder.
● Control system:
1) 1 set of electrical cabinet for temperature control and main motor inverters control.
2) 1 set of take-up control box with meter counter.
3) There is a speed controller which controls the speeds of the main machine and the speeds of the subsidiary machine synchronously.
● Spare parts list
1. | Temperature Sensor Wire for Barrels | 2 Pcs |
2. | Popular Screws | 1 batch |
3. | Indicator | 1 Pc |
4. | Screen | 0.5 ㎡ |
5. | Fuse | 5 Pcs |
6. | Cartridge Heater for T-die | 2 Pcs |
7. | Air Inflation and Deflation Button | 5 Pcs |
8. | Temperature Sensor Wire for T-Die | 2 Pcs |
9. | Copper Shovel | 1 Pc |
10. | Cartridge Heater for Feed Block | 2 Pcs |
11. | Operational Manual | 1 Full Set |
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 60 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l ü Specifications and functions of the machine match the content of this contract.
l ü Electrical, mechanical and control systems run smoothly.
l ü Run out sample products as required.
l ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
6.1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
6.2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
6.3 The buyer pays the seller under Article 4 of this contract.
6.4 The expenses such as as airplane, visa, travel expenses,other expenses for foreign engineers in china will be paid by the Seller.
6.5 The Other expenses such as pick up and see off ,dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .
ARTICLE 5: SELLER'S LIABILITY
7.1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
7.2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.
E-mail