OG-LX120卷边机OG-LX120 rim roller machine

A. 设备技术参数Technical Specification
序号 No | 明细 Detail description | 参数 Parameter | 备注 Remark |
1 | 调速方式 Speed control | 变频调速 By inverter | |
2 | 适用塑杯材料 Cup material suitable | 圆口PP/PS/PET/PLA Round cup PP/PS/PET/PLA | |
3 | 适用塑杯口径 Cup diameter suitable | 50-120mm 50-120mm | |
4 | 输入电源 Power input | 380V/50Hz 380V/50Hz | 三相 three phase |
5 | 卷边速度 Speed | ≤800个/分钟 ≤800 pcs/min. | 材料不同,速度不同 Different material with different speed |
6 | 整机功率 Total power | 13KW 13KW | |
7 | 耗气量 Air consumption | 0.5立方米/分钟 0.5 cubic meter/min. | |
8 | 外形尺寸(长/宽/高) Dimension (L/W/H) | 2000×400×980mm 2000×400×980mm | 输送段 Transport part |
9 | 外形尺寸(长/宽/高) Dimension (L/W/H) | 1030×800×1300mm 1030×800×1300mm | 主机 Rim roller part |
10 | 外形尺寸(长/宽/高) Dimension (L/W/H) | 2900×400×1500mm 2900×400×1500mm | 数杯机 Counting part |
11 | 重量 Weight | 约800公斤 Around 800kg |

B. 主要电器件Main electrical components
序号 | 品名 | 单位 | 数量 |
1 | 台达变频器 1.5KW DELTA inverter 1.5KW | 套 set | 1 |
2 | 数杯控制器 Cup counting controller | 只 piece | 1 |
3 | 输送皮带 Transport belt | 条 piece | 4 |
4 | 阳明固态40A配散热座 TAIWAN SSR 40A with cooling base | 套 set | 7 |
5 | 亚太温控表 YATAI temperature controller | 个 piece | 4 |
6 | 施耐德按钮(绿色NO) SCHNEIDER switch(green color NO) | 个 piece | 1 |
7 | 施耐德按钮(绿色NC) SCHNEIDER switch(green color NC) | 个 piece | 1 |
8 | 施耐德急停(NO+NC双触点) SCHNEIDER emergency stop switch( NO+NC double contactor) | 个 piece | 1 |
9 | 施耐德两档转换开关 SCHNEIDER two gear switch | 个 piece | 2 |
10 | 施耐德急停按钮ZB2-BS54C(自锁) SCHNEIDER emergency switch ZB2-BS54C(auto lock) | 个 piece | 1 |
11 | 吹杯电子阀SMC SMC cup blow valve | 个 piece | 1 |
12 | 加热瓦片650W230江苏 Chinese ceramic heater 650W/230V | 个 piece | 6 |
13 | 5K单圈电位器 5K single loop potentiometer | 个 | 1 |
14 | 电柜排气扇120/120 Control panel exhaust fan 120/120 | 个 piece | 1 |
15 | 中间继电器DC24V+底座 Auxiliary relay DC24V+base | 个 piece | 4 |
16 | 开关电源NES-50-24 NO:DB35259829 Switching power supply NES-50-24 NO:DB35259829 | 个 piece | 1 |
17 | 施耐徳空气开关 20A/1P SCHNEIDER air breaker 20A/1P | 个 piece | 3 |
18 | 施耐徳空气开关 25A/1P SCHNEIDER air breaker 25A/1P | 个 piece | 3 |
19 | 施耐徳空气开关 10A/2P SCHNEIDER air breaker 10A/2P | 个 piece | 1 |
20 | 步进电机16N Stepping motor 16N | 套 set | 1 |
21 | 放大器 Amplifier | 套 set | 1 |
22 | 电子阀 Electronic valve | 个 piece | 6 |
23 | 亚德客气缸40X300 AIRTECH air cylinder 40X300 | 个 piece | 1 |
24 | 气缸25X20 Air cylinder 25X20 | 个 piece | 1 |
25 | 气缸16X10 Air cylinder 16X10 | 个 piece | 2 |
26 | 卷边主电机1.5千瓦产地东莞台历 Rim roller main motor 1.5KW TAILI brand | 个 piece | 1 |
27 | 进杯输送电机300瓦产地东莞台历 Cup insert motor 300W TAILI brand | 个 piece | 1 |
28 | 出杯输送电机90瓦产地东莞台历 Cup outlet motor 90W TAILI brand | 个 piece | 1 |
29 | 电子阀吹气SMC SMC electronic valve for air blow | 个 piece | 1 |
备注:
Remark:
根据实际生产需要,上述配置可能发生变动,但更改后的电器元件质量不低于上述表格中所列明的电器元件。
According to the actual production inquiry, the above mentioned electrical parts might be replace to other brand, but the replacement quality should be same as those listed above.
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 30 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l ü Specifications and functions of the machine match the content of this contract.
l ü Electrical, mechanical and control systems run smoothly.
l ü Run out sample products as required.
l ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
6.1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
6.2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
6.3 The buyer pays the seller under Article 4 of this contract.
6.4 The expenses such as as airplane, visa, travel expenses,other expenses for foreign engineers in china will be paid by the Seller.
6.5 The Other expenses such as pick up and see off ,dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 150USD each day .
ARTICLE 5: SELLER'S LIABILITY
7.1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
7.2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.
E-mail