OG-PB1600 - 1600MM 2 Layer bubble film making machine with2 screw barrels

ITEM | DESCRIPTION | UNIT PRICE/USD | QUANTITY | AMOUNT/USD |
1 | OG-PB1600 1600mm 2 Layer AIR BUBBLE MACHINE
| 1PC |
| |
2 | SUCTION FEEDER | 1PC | ||
3 | WATER COOLING TOWER+water tank+Water pump | Optional selection | 1PC | |
4 | Mixing bucket 500KG with heating | Optional selection | 1PC | |
5 | Edge material recycling machine | Optional selection | 1PC | |
DELIVEYR TIME | 50 DAYS | |||
PAYMENT TERM | 30% DEPOSIT AND BALANCE BEFORE SHIPMENT | |||
Optional selection:Edge material recycling machine | ||||
Note:

MAIN PAREMETERS:
RAW MATERIAL:LDPE &LLDPE
MAX WIDTH OF FINISHED ROLLER:1600mm
MAX DIAMETET OF FINISHED ROLLER: 1300mm
MAX EXTRUDER THICKNESS:450gsm
MIN EXTRUDER THICKNESS:50gsm
AVERAGE OF EXTRUDER THICKNESS :5%
POWER:3P 4 WIRES,380V,50HZ
TOTAL POWER:55KW
MACHINE DIMENSION:10mX3.5mX3m(LXWXH)
WEIGHT:9000KG
STRUCTURE:STEEL
EXTRUDER CONTROL SYSTEM:1SET
EXTRUDER UNIT:2SETS
T DIE:1SET
BUBBLE COMPOUNT AND DRIVE SYSTEM OF MAIN BODY:1SET
ONLINE TAKE UP AND SLITTING SYSTEM:1SET
MANUAL SLITTING:1SET
MANUAL DOUBLE STATION CANTILEVER WINDING DEVICE:1SET
WHOLE MACHINE SECURITY SYSTEM:1SET
Item | name | picture | description | quantity |
5.1 | CONTROL SYSTEM
| CONTROL SYSTEM CONSISTS OF : MOTOR, DIGITAL INVERTER AND ELECTRICAL CONTROL PARTS., TO ENSURE STABLE AND EFFICIENT RUNNING OF MACHINE。 | 1set | |
PLC: 1 unit Touch screen: 1 set Electrical control cabinet: 2 sets | ||||
5.2 | EXTRUDER UNIT
| EXTRUDER PARTS CONSIST OF MOTOR,S, GEARBOX ZLYJ SERIES, SCREW BARREL, CONNECOTOR OF SCREWS AND SCREEN CHANGER. MAIN FUNTION IS :AUTOMATICLLY SUCK RAW MATERIAL INTO FEEDER THEN GO TO SCREW BARREL, MELT RAW MATERAIL IN SCREW BARREL PART AND PUSH TO SCREEN CHANGER PRAT, AND AFTER SCREEN CHANGER, RAW MATERIAL GOES THROUGH T DIE. | ||
BUBBLE LAYER MOTOR 30KW, 1PC INVETER 30KW 1PC GEARBOX ZLYJ200 1PC SCREW BARREL DIA 75MM 1PC | ||||
BOTTOM LAYER MOTOR 18.5KW, 1PC INVETER 18.5KW 1PC GEARBOX 173 1PC SCREW BARREL DIA65MM 1PC | ||||
SCREW BARREL L/D RATIO:35:1 RAW MATERAIL OF SCREW BARREL :SCREW BIMETALLIC AND BARREL 38CrMoALA WITH NITRDING TREAMENT TEMPERATURE ZONE:8 SCREW HEATER POWER:16KW SCREW HATER: CERAMIC CONNECTOR OF SCREW:2SETS HEATER ZONE:1ZONE HEATER POWER:3KW | ||||
FILTER CONNECTION:1SET HEATER OF FILTER:1ZONE HEATER POWER OF FILTER:3KW HEATER:ALUMINUM HEATER MANUAL SCREEN CHANGER:1SETS | ||||
5.3 | T DIE
| 1 SET | ||
DIE HEAD STRUCTION: COAT HANGER RAW MATERAIL: 718 DIE STEEL WIDTH OF T DIE :1800MM, 1PC LAYER: 2 EXTRUDER SHEET MAX WIDTH: 1600MM EXTRUDER SHEET MIN WIDTH900MM HEAT ZONE: 7 HEATER POWER: 15KW WAY OF HEATER: Internal heating
| ||||
5.4 | BUBBLE COMPOUND AND DRIVE SYSTEM OF MAIN BODY
| BUBBLE COMPUND SYSTEM CONSISTSOF BUBBLE ROLLER, SILICON ROLLER, PRESSURE ROLLER, TRANSFER ROLLER, AND UNFOLD ROLLER. EACH ROLLERS IS CONNECTED WITH COAT WATER CIRCULATION SYSTEM. DRIVE SYSTEM IS WITH GEARBOX. WITH ROTATE JOINTS
| 1SET | |
EFFECTIVE LENGTH OF BUBBLE ROLLER: 1750mm 1PC BUBBLE HEIGTH DIATER:10mmm*4mm SILICON ROLLER:1PC PRESSURE ROLLER:1PC TRANSFER ROLLER:1PC DIAMETER OF UNFOLD ROLLER 270mm:1PC HYDRAULIC CYLINDER:1PCS DRIVE SYSTEM:1SET MOTOR POWER1.5KW1PC INVERTER 1.5KW 1PC COAT WATER CIRCULATION SYSTEM:1SET NEGATIVE PRESSURE VACUUM BOX:1PC | ||||
5.5 | ONLINE MANUAL TRACTION AND SLITTING SYSTEM
| SLITTING SYSTEM CONSISTS OF : BALDE CARRIER, BLADE , AND ROLLER FOR WATER MATERIAL, DRIVE SYSTEM IS WITH GEARBOX. WITH ROTATE JOINTS. MAIN FUNCTION OF BUBBLE COMPOUND SYSTEM: IS TO COMPOUND TWO SHEET OF BUBBLES | 1SET | |
EFFECTIVE WIDTH OF FLAT ROLLER 1750mm: EFFECTIVE WIDTH OF STEEL ROLLER1750mm:1PC EFFECTIVE WIDTH OF PRESSURE ROLLER 1750mm:1PC FFECTIVE WIDTH OF UNFOLD ROLLER 1750mm:1PC HYDRAULIC CYLINDER:2PCS DRIVE SYSTEM:1SET MOTOR POWER1.5KW1PC INVERTER 1.5KW 1PC COAT WATER CIRCULATION SYSTEM:1SET ONLINE MANUAL SLITTING SYSTEM 1SET UNIT OF SLITTING::1 SETS | ||||
5.6 | AUTOMATIC | 1SET | ||
TWO PISTONS CYLINDER SLITTING POSITION 2000MM:1SET WINDING TYPE:CENTER WIIND ROLLER CHANGE: AUTOMATIC MAX WIDTH OF WING 1600mm MAX DIAMETER OF WIND 1300mm DIAMETER OF AIR SHAFT WIND ROLLER:3INCH DRIVE SYSTEM:1SET HYDRAULIC:1PC TORQUE MOTOR 2.2KW:2PCS ROTATING MOTOR 1.5KW:1PC
| ||||
5.7 | SECURITY SYSTEM | SECURITY SYSTEM CONSISTS OF: ALARM NOTES, MARK AND SAFETY COVER. ELECTRICAL PARTS HAVE EMERGENCY STOP BUTTONS. ONCE PRESS EMERGENCY STOP BUTTON, WHOLE LINE WILL BE STOPPED | 1SET | |
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l ü Specifications and functions of the machine match the content of this contract.
l ü Electrical, mechanical and control systems run smoothly.
l ü Run out sample products as required.
l ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 150USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.
E-mail