Interview
OG SERI One-step injection stretch blow molding machine OG-ISBM
Injection part | Model | parameter |
螺杆直径 Screw Dia | 50 | |
理论注射容积 Theoretical short Volume | 481cm3
| |
注射压力 Injection Pressure | 176Mpa
| |
液压系统压力 System pressure | 140Kg/cm
| |
实际注塑量(PS) Actual injection volume (PS) | 452g(ps)/16oz
| |
螺杆行程 Nozzle Stroke | 245mm
| |
Clamping part | 吹模锁模力 Clamping Force | 150KN
|
注模锁模力 Injection force | 400KN
| |
转盘直径 Turntable diameter | 950mm
| |
垂直开模行程 Vertical opening stroke | 600mm
| |
吹模部分闭合高度 Blow mold part closing height
| 550mm
| |
注模部分闭合高度 Injection mold part closing height | 550mm
| |
Blowing part | 能承受的最大吹气压力 maximum blowing pressure
| 30Kg
|
需要的排气量 required exhaust volume, | 1M³
| |
能吹的件最大容积 required exhaust volume | 4L
| |
能吹的件最大外形(或每个 件之间允许的最大中心距) maximum center distance | 250MM-diameter
| |
需要冷水机数量及功率 number and power of chillers | 8HP
| |
Mould part | 注塑模型芯材料 core material | S136 heat treatment to HRC48-50 |
注塑模型腔材料 cavity material
| S136 heat treatment to HRC48-50 | |
热流道品牌 hot runner brand
| Dongguan Maijia (Yudo Technology) | |
吹瓶模材料 blow mold material | S136 heat treatment to HRC48-50 | |
注塑模具寿命 Injection mold life | 2 million molds | |
吹瓶模具寿命 bottle blowing mold life
| 2 million molds | |
others | 可以注吹的材料 Materials | PC,PC(LED扩散料),PMMA,PS,PET,PCTG,PP
|
产能或设备能达到的最快周 期(可分腔数详细列出)production capacity or the fastest cycle
| One shot two、15-18s
| |
气动件品牌 Pneumatic parts brand | Air Tac | |
电子件品牌 electronic parts brand | Schneider | |
伺服电机品牌 servo motor brand
| Italy-Fisher | |
伺服电机功率 Servo motor power
| 20Kw
| |
最大油泵压力 Maximum oil pump pressure | 16Mpa
| |
油泵马达品牌 Oil pump motor brand | Germany-Ecker | |
油泵马达 Oil pump motor | Parkland for shooting platform | |
电热功率 Electric heating power | 12.2Kw
| |
油箱容积 Oil tank capacity | 450L
| |
机器外形尺寸 Machine dimensions | 4.2m*1.6m*3.65m
| |
机器重量 Machine weight | 6500kg
|
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l ü Specifications and functions of the machine match the content of this contract.
l ü Electrical, mechanical and control systems run smoothly.
l ü Run out sample products as required.
l ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
6.1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
6.2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
6.3 The buyer pays the seller under Article 4 of this contract.
6.4 The expenses such as as airplane, visa, travel expenses,other expenses for foreign engineers in china will be paid by the Seller.
6.5 The Other expenses such as pick up and see off ,dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 150USD each day .
ARTICLE 5: SELLER'S LIABILITY
7.1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
7.2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

Copy product links
Long by picture save/share