图片展示

MR ALADDIN :   18816899059@163.com

MR AU:                auvuchi@163.com 

0086-18816899059

0086-15018408881

Hello! login Register
  • 立即询盘
  • 我要分享



PS recycling machine

 

  • Inquiry
  • Share

Products introduction:

This machine is special for polystyrene. It adopts single screw, double stage plasticification, increasing compress ratio. The whole machine consists of, main machine, cooling tank and granulator. It can recyle many foamed products, such as ps, xps, eps etc.

1. 包括以下主要部份 Including main parts as the following:

 

序号

No.

 

名称

Name

 

图片

Picture

件数P

c

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

Φ270+Φ135 挤出机

Φ270+Φ135Extruder

一级螺杆长 2000mm

一级螺杆直径: 270mm+135mm

电机: 22KW, 变频器控制

主电机带动减速箱工作。

First screw length: 2000mm

First screw diameter: 270mm+135mm

Motor: 22KW, driven by inverter.

Main motor drives gear box.

(1)螺杆机筒:

材料均为优质钢

机筒采用 4 区加热, 加热电压 380V

⑵ 减速箱为硬齿面 225-16,材质 FCD25

可锻铸铁,  齿轮: SCM4 特殊齿形磨光和加热处理。

The screw and the barrel

Material: High quality steel

Barrel heating zones: 4pcs

Voltage: 380V 2)

Gearbox:

Model: hard tooth-surface 225-16

Material: FCD25 malleable cast iron.

Gear wheel: SCM4 special gear wheel

burnishing and heating dealing.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1   套

1

s

e

t

 


 

 

 

 

 

 

 

 

D

 

 

 

 

换网器  Screen changer

换网操作简单方便,不漏料。

The operation of changing net is

easy and convinient ,without leaking.

 

 

 

 

 

 

 

1   套

1

s

e

t

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

主控箱 Main control cabinet

(1)热电偶传热。温度控制准确

Heat is transfered by thermocouple. The

temperature is controlled accurately

(2) 智能温度控制器由PID 控制,交流接触器 执行

Brainpower temperature controller is controlled by PID, AC contactor execute

(3) 交流接触器,空气开关及电器均采用国内 知名品牌。

AC contactor, air switch and electrical            equipments all adopt domestic famous brand. (4) 温控表准确显示各区温度及控制加热系统  加热

The temperature controller shows each zone            temperature accurately and controls heating system

(5)电控系统共 4 个控制区,         The electric control system has total 4pcs control zones.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1   套

1

s

e

t

 


 

 

 

 

 

 

G

不锈钢水槽 Stainless steel water tank

不锈钢水槽,一个进水口, 一个出水口,循环水

冷却。

Stainless steel tank,one water inlet, one water outlet, cooled by cycling water

水 槽 尺 寸 : 2000mm×600mm×280mm   Water tank size: 2000mm×600mm×280mm

 

 

 

 

 

 

1   套

1

s

e

t

 

 

 

 

 

 

H

 

切粒机 Cutter

切粒电机功率: 2.2KW

Pellet cutter motor power: 2.2KW             变频器控制,切粒均匀, 美观。         It was controlled by inverter, and the        granular is well-distributed and beautiful.

 

 

 

 

 

 

1   套

1

s

e

t

 

 

 

I

送料架 Material conveying rack

防止料条下落, 使设备整体更美观

Avoid material dropping to ground. make whole m achine look beautiful

一

套

1

s

e

t

 

2,技术要求 Technical requirement

产量:50-100KG/H;

Output:50~100kg/h

压料电机功率:1.5KW;

Pressing material motor power: 1.5kw

装 机 容 量 :42KW

Mounted power: 42kw

用电要求:380V 三相 50HZ;

Power requirement: 380v three-phase/ 50HZ

冷却水压:≥0.2Mpa;


Cooling water pressure: ≥0.2Mpa

成套尺寸:4m×4m×3m;

All size: 4m×4m×3m

机组重量:2T

Total weight: 2T

 

-FOB any port of China.

- Delivery time: The Seller will hand over the goods to the buyer after 30 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment

- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install

 

 

Set up :

- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.

Acceptance :

l  Equipment that is considered valid must meet the following requirements:

l   Specifications and functions of the machine match the content of this contract.

l   Electrical, mechanical and control systems run smoothly.

l   Run out sample products as required.

l   Must have a certificate of quality of the place of production and documents attached to the machine.

ARTICLE 2: PAYMENT METHOD

v The buyer makes payment to the seller in 02 times by transfer to the seller's account.

v  First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.

v  2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.

ARTICLE 3: WARRANTY

Warranty period: within 12 months from the acceptance date of the equipment.

During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.

(If the device is faulty by the user or is affected by unintended issues such as

Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)

 

ARTICLE 4: BUYER'S LIABILITY

6.1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,

The buyer is responsible for dropping the item at the buyer's address to the correct location

6.2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.

6.3 The buyer pays the seller under Article 4 of this contract.

6.4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.

6.5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 120USD each day .

 

ARTICLE 5: SELLER'S LIABILITY

7.1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.

7.2 Vendors undertake:

Asian. Ensure time and progress of equipment handover

B. Assurance of quality and content in accordance with agreement requirements.

C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.


图片展示

© 2025 GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD all rights reserved

Contact us
GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD

Telephone: 020-38912384

Email :

Sales@champion-automation.com

Fax: 020-38912463

Tel: 0086-18816899059, 15018408881

Add:Room 2116,No 101-1 ,Li Xin 12th street, Xin Tang Town, Zeng Cheng District, Guang Zhou, Guang Dong province, China

 

Hotline
0086-18816899059
Office hours
from Monday to Saturday
Qrcode
Scan QR code
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.
粤ICP备2022108158号