图片展示

MR ALADDIN :   18816899059@163.com

MR AU:                auvuchi@163.com 

0086-18816899059

0086-15018408881

Hello! login Register

Plastic Vacuum forming machine OG-HD800

Interview

Product Detail

1. Equipment Overview

OG-HD800 single station programmable thick plastic vacuum forming machine, designed and produced plastic suitable for small and medium-sized vacuum forming processes according to needs. The design structure conforms to ergonomic principles, ensuring equipment safety, environmental protection, durability, energy saving, simple operation, high reliability, good stability, and functional quality requirements.

The programmable control system and human-machine interface (HMI) adopt Taiwan Delta, intelligent control widescreen system, high-resolution touch temperature module, flexible design, and flexible expansion (including electrical system and mechanical structure) for small-scale improvement, providing sufficient space for expansion and reducing customer investment costs. It is a valuable and reasonable solution.

STT Name Description Detailed Parameters and Instructions

1. Maximum molding area 800mm × 800mm

2. Maximum molding height 300mm

3 Heating furnaces with a power of 30KW  ,Actual power of 18KW

5 vacuum pump capacity 3 Kw-100M3

6 Power Supply

Three phase five wire 380V/50HZ, voltage fluctuation range ± 10%;24V DC power supply control

7 machines with a total power of 40KW (110KW ≤ average power ≤ 130.00KW)

8 Production efficiency  1-4 minutes/1-4 millimeters ,Based on the cooling time of film raw materials and molds,The thickness of the raw material board is 1-4mm

10 is suitable for ABS, PC, PS, PP, PE, PVC, EVA, ABS/PMMA alloy plates, ABS/PC alloy plates, and automotive decorative materials.

11 customers require a compressed air source of 1 '(0.6-0.8Mpa) with a displacement of 1.0m ³/min

12 machine weight  2.5T (reference weight)

13 machine dimensions (MM) length 2500mm x width 2300mm x height 3000mm (reference)





Main electrical component brands (equipment configuration)

STTT Name Brand Description

1 FATEK PLC Programmable Control Module

2. Chinese industrial touch screens

3 Heating Ceramics 650W Heating

4 Vacuum pumps RUFUS 100m ³

5 Delay IDEC

6 Mindmen solenoid valves

7 cylinders (foreign joint ventures), Zhicheng China

8 AOYI temperature control system module

9 UNI-T hot film testing machine ,China

10 Contacts LS

11 Air oil-water separator,SMC Japan

12 Spray Equipment   BASF

4,Workflow:

Feed (manual) → Plastic film fixture frame (manual) → Heating moving film (automatic) → Heating furnace (fixed) → Film moving to suction molding position - upper or lower mold (automatic) → Vacuum molding (automatic) → Cooling (automatic) → Blowing out mold (automatic) → Upper and lower mold reset (automatic) → Plastic film fixture frame (manual) → Pick up sp (worker)





5、 Technical Description

Equipment assembly instructions

A. The device consists of structural framework, molded components, heating system, airway control system, electrical control system, motion motor electrical system, vacuum system, cooling system and other components.

B. Vehicle structure: Select high-quality steel pipes (or steel) and welded joints that meet national standards. All metal surfaces are coated with anti rust and anti rust coatings. All mechanical structures use universal and standard parts, which are easy to maintain and replace

◎ Formed parts

A. Mold structure: ① Rectangular steel bottom mold platform and assembly welded steel plate moving cylinder are healthy, practical, and convenient, reducing working time. ② The upper and lower molds are adjustable speed product accessories, and the molded products meet digital control requirements, ensuring product thickness, control range accuracy, reducing product waste, and automating production operations.

B. When changing the mold outlet size of the mold, it will also be adjusted or replaced accordingly to adapt to the mold window mold.

C. Film clamping frame: mainly used for material clamping, driven by synchronous frame and direct bearing, using high-quality steel packaging frame structure with strong strength and high rigidity, used for pressing straight boxes

In this way, there will be no thermal deformation or prolonged bowing.

◎ Heating system

A. The heating method adopts a heating surface furnace, mainly heating the furnace body and carbon fiber heating tubes

B. The temperature control adopts advanced domestic temperature control modules for precise display and control. Each temperature controller independently controls the heat (square radiation area: 200 × 120mm) and has an automatic voltage regulator.

C. The furnace center is equipped with a thin film plate thermometer point, which is easy to form reference molding and control floating temperature adjustment based on the thermal temperature monitoring board.

◎ Air duct system

The air system consists of natural gas pipelines, various conventional valves, and proportional pressure valves. Compressed air pipelines are selected from nationally renowned brands

◎ Vacuum pump system

A. The vacuum system includes vacuum gauges, vacuum pipelines, vacuum pumps, vacuum chambers, vacuum tanks, vacuum valves, etc. The vacuum tube is connected to the mold interface using a large-diameter pipe.

B. The vacuum pump adopts RUFUS 100M3/HR, with a vacuum recovery rate of up to 75% before each vacuum cycle, and a vacuum of ≥ 50% throughout the entire production process.

C. The vacuum process has both fast and slow vacuum functions, making it easy to adjust the vacuum process to ensure product safety.

◎ Electrical control system

C. All action programs are controlled by PLC and have touch screens such as human-machine interface and Chinese interface (with English interface available). The installation and modification of the machine include button operation and all process parameters, making the unit easy to operate and maintain.

D. There are two ways to operate the equipment: manual/automatic. All installation operations are completed on the touch screen. During operation, the staff will press the start button to complete the film sheet, and the machine will complete it on its own after molding.

◎ Cooling system

Cooling system: equipped with multiple powerful blowers and nozzles with water sprayers. Settings are mainly used to control the molding or cooling of products

7. Connectors (customer power, water, gas, etc.)

A. Water: Water line connection used for cooling products

Power supply: three-phase 5-wire 380V power supply with a capacity of 105.00Kw.

C. Air: 1-inch compressed air connector, pressure 0.6-0.8MP.

Note: Customers can purchase air compressors, air compressors, and air dryers themselves

8. Factory environmental conditions

A. The width of the factory door is 3m

B. The factory door height that the machine can transport is 3.5m

The factory environment temperature is -5~40 ℃, and the equipment works normally within this temperature range.

D. The maximum ground load is 1 ton/square meter

F. Minimum factory height of 4.5m

FOB Guang Dong China.

- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment

- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install.

Set up :

- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.

Acceptance :

l Equipment that is considered valid must meet the following requirements:

l ü Specifications and functions of the machine match the content of this contract.

l ü Electrical, mechanical and control systems run smoothly.

l ü Run out sample products as required.

l ü Must have a certificate of quality of the place of production and documents attached to the machine.

ARTICLE 2: PAYMENT METHOD

v The buyer makes payment to the seller in 02 times by transfer to the seller's account.

v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.

v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.

ARTICLE 3: WARRANTY

Warranty period: within 12 months from the acceptance date of the equipment.

During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.

(If the device is faulty by the user or is affected by unintended issues such as

Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)

 

ARTICLE 4: BUYER'S LIABILITY

1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,

The buyer is responsible for dropping the item at the buyer's address to the correct location

2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.

3 The buyer pays the seller under Article 4 of this contract.

4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.

5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 150USD each day .

 

ARTICLE 5: SELLER'S LIABILITY

1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.

2 Vendors undertake:

Asian. Ensure time and progress of equipment handover

B. Assurance of quality and content in accordance with agreement requirements.

C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

 

 

 


Plastic Vacuum forming machine OG-HD800
Long press to look detail
Long by picture save/share
INQUIRY

在线询盘 MORE+
  • 联系人 *

  • 手机 *

  • 描述

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Inquiry Content:


You have no items to require

Add Successfully
图片展示

© 2025 GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD all rights reserved

Contact us
GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD

Telephone: 020-38912384

Email :

Sales@champion-automation.com

Fax: 020-38912463

Tel: 0086-18816899059, 15018408881

Add:Room 2116,No 101-1 ,Li Xin 12th street, Xin Tang Town, Zeng Cheng District, Guang Zhou, Guang Dong province, China

 

Hotline
0086-18816899059
Office hours
from Monday to Saturday
Qrcode
Scan QR code
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.
粤ICP备2022108158号