Side sealing bag making machine

Quotation list
型号 Model | OG-BH1000-系列多功能边封热切制袋机 OG-BH1000-Series Multi-function Side Sealing Bag Making Machine |
机型图片
Machine Pictures
|
HDPE/LDPE
|
主要配置 Main Configuration
序号 NO. | 名称 Name | 配置明细 Configuration details |
1 | 主机系统 Main system | 1.5KW 6P 台湾利茗主电机、台湾台达变频调速 AC motor with Taiwan inverter control speed |
2 | 前送牵引系统 Traction system | 配 2.5kw 华大伺服电机及驱动器、2016 液晶智能电脑控制器 2.5kwHUADA servo motor & HUADA AC driver,2016 LCD computer controller |
4 | 后送系统 Feeding system | 0.75KW4P 电机 海浦变频调速*2sets AC motor with inverter control speed*2sets |
5 | 色标光电眼 Color tracking | 配意大利 TL50 光电眼跟踪色标 Italy photoelectric eye tracking |
6 | 控温系统 Temperature controlling | 配汇邦智能控温表 Thermocouple & Automatic Digital HUIBANG brand |
7 | 热切刀材料 Material of sealing knife | 选用优质合金铜 Use alloy copper |
8 | 封辊材料 Material of sealing roller | 采用耐高温硅胶材料 Use high thermostability material |
9 | 热封模 Sealing mould | 选用优质合金铜 Use alloy copper |
10 | 传动轴承 bearing | 采用日本 NTN Use NTN Japan |
11 | 封辊材料 Material of sealing roller | 采用耐高温材料 Use high thermostability material(SILICON) |
12 | 自动纠偏系统 E.P.C system | 采用磁粉自动张力、台湾富台光电眼追边 Use Magnetic particle brake tension(china brand) |
13 | 自动冲床控制系统 Punching system | 与主机控制一体化 Integration with the cutter |
14 | 机械夹手控制 Manipulator running | 采用国产知名伺服控制系统 Use servo control system |
16 | 增加缸 Booster cylinder | 台湾久力 Use Taiwan Juli |
15 | 自动冲底座 The base of Puncher | 采用气动推拉控制 Pneumatic control |
4
技术参数 Technical Parameter
Specification | MODLE |
OG-BH1000-1000 | |
450mm*2lines | |
制袋长度 Max.Length of bag making | 220-600mm |
制袋速度 Machine speed | 100-200(pcs/min) |
制袋厚度 thickness of film | 0.01-0.1mm |
制袋误差 Tolerance | ±1mm |
整机功率 Power Required | 8.2KW |
设备尺寸 Machine size | 5000*1650*1600MM |
机器重量 Machine N.W | 1650kg |
随机配件 Spare part
序号 No. | 名称 Item | 数量 Amount |
1 | 前送弹簧 350MM feeding spring | 100/pcs |
2 | 热电偶 thermocouple | 2/pcs |
3 | 继电器 220V relay | 2/pcs |
4 | 欧姆龙时间继电器 time relay | 1/pcs |
5 | 耐热布 heat-resisting fabric | 2/pcs |
6 | 加热管 heater | 1/pcs |
7 | 静电棒 Static bar | 1/pcs |
9 | 工具 tool | 1/set |
10 | 工具箱 toolbox | 1/pcs |
11 | 说明书 instruction | 1/pcs |
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays (1- 5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment, from the day confirm the sample draw (if have)
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up:
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance:
1 . Equipment that is considered valid must meet the following requirements:
2 . Specifications and functions of the machine match the content of this contract.
3 . Electrical, mechanical and control systems run smoothly.
4 . Run out sample products as required.
5 . Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2 : PAYMENT METHOD
The buyer makes payment to the seller in 02 times by transfer to the seller's account.
First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer ( IF YES) . The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment. During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to
repair the equipment. All costs incurred will be borne by the Seller. (If the device is faulty by the user or is affected by unintended issues such as Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER' S LIABILITY
1.Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 380V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, electric three-phase electric switches, electric lines, steam- lines, gas lines, gas valves, pipes, elbows, The buyer is responsible for dropping the item at the buyer's address to the correct location.
2. The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3. The buyer pays the seller under Article 4 of this contract.
4. The expenses such as other expenses for foreign engineers in China will be paid by the Seller.
5. The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer, the buyer will be pay for the engineer 100USD each day.
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake: Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine
E-mail