Φ50~Φ160 PVC Pipe Production Line

序号 Item | 产品 Production | 数量 Quantity | 价格(万元) |
1 | 塑料自动加料机 Plastic automatic charger | 2台 2Sets | |
2 | 料斗式塑料干燥机 Hopper Plastic dryer | 2台 2Sets | |
3 | SJ75/33单螺杆挤出机 SJ75/33 single screw plastic extruder | 2台 2Sets | |
4 | 液压换网器 Screen Exchanger | 1set | |
5 | Φ50~Φ160 PE管挤出模具 Φ50~Φ160 PE pipe Extrusion Mould | 1台 1Set | |
6 | 真空定型箱 Vacuum forming tank | 1台 1Set | |
7 | 喷淋冷却箱 Spray cooling tank | 1台 1Set | |
8 | 三爪牵引机 Three-claw Haul-off machine | 1台 1Set | |
9 | 切割机 Cutter | 1台 1Set | |
10 | 堆放架 Stacker | 1台 1set | |
合计 Total | |||
一、 塑料自动加料机 Plastic automatic charger
加料能力(5m) Charging capacity(5m) | 200kg/h |
加料旋涡气泵功率 (Charging vortex gas pump power) | 1.1KW |
二、 料斗式塑料干燥机 Hopper plastic dryer
料斗容积Hopper Volume | 160L |
装料量kg Fill material capacity | 100kg |
加热功率 Heating power | 5.5KW |
风机功率 Fan power | 0.25KW |
三、 SJ75/33单螺杆挤出机 SJ75/33 Single screw extruder
螺杆、料筒Screw/Barrel
| 采用38 CrMoAlA,调质及氮化处理,料筒采用双金属制作 Screw and Barrel material 38CrMoA1A Nitriding, Barrel produced with double matals
|
螺杆直径 Screw Dia. | 75mm |
螺杆长径比 Screw Length/Diameter Ratio | 33:1 |
主电机功率 Main Motor Power | 55KW西门子贝得电机 |
主电机调速 Main motor speed adjusting | 采用55KW ABB变频器 Adopt ABB 55KW Inverter |
机筒加热 Heating Power | 采用铸铝加热器,带风机冷却 Adopt foundry aluminum electric heater, fan cooling |
加热功率 Heating Power | 4KW×5区 4KW×5 zone |
减速箱 Gear box | ZLYJ225硬齿面减速箱 ZLYJ225 rigid gear surface gear box |
主要电器 Main electric equipment | 日本欧姆龙温控表,西门子接触器 Japanese OMRON Temperature Control Meter Siemens Contactor |
四、 管挤出模具pipe extrusion mould

模具规格Mould specification | Φ50~Φ160MM |
五、 真空定型箱 Vacuum Calibration Tank

真空箱长度 Calibration Tank Length | 6米 6 meters |
箱体 Tank material | 采用3mm不锈钢板 Adopt 3mm stainless steel board |
真空泵(真空泵配变频压力控制) Vacuum pump | 直联水环式4KW×2台 Direct water ring type 4kw×2 set |
水泵 Water Pump | 4KW×2台 4kw×2set |
真空箱前后自动移动 Tank length ways move | 0.75KW摆线针轮减速电机,可移距离800mm 0.75kw gear box speed reducer motor, adjusting distance equal to 800mm |
六、 喷林冷却箱Spray cooling tank
冷却箱长度 cooling tank Length | 6米 |
箱体 Tank material | 采用2mm不锈钢板 Adopt 2mm stainless steel board |
水泵 Water Pump | 4KW×1台 4kw×1set |
七、 三爪牵引机 Three-claw Haul-off machine

有效牵引长度 | 2500mm |
牵引速度 | 0.3~3米/分 |
牵引电机功率 | 3.7KW |
减速机 | 苏州市国泰减速机厂 |
最大牵引力 | 30000N |
牵引调速 | 采用3.7KW变频器 |
下牵引机升降调整 | 1.1KW摆线针轮减速电机调节 |
上牵引架压紧 | 气动 |
链条 | 1寸弯板双链条 |
牵引块材质 | 橡胶 |
八、 切割机 cutter
切割管材直径范围Diameter scope of cutting | Φ50~Φ160mm |
锯片直径 Diameter of saw | Φ300mm |
切割电机功率 Cutting motor power | 1.1KW |
锯架纵向随动行程 Bracket longitudinal Moving distance | 500mm |
气动翻料,带行程开关安装座,用以提供定长切割信号 Stacking by Gas cylinder, Adopt limited switch send out cutting signal |
九、 堆放架Stacker
堆放架长度 Length of stacker | 2米 2meters |
翻板 Support-Board | 0.8mm不锈钢板 0.8mm stainless steel |
气动翻料,带行程开关安装座,用以提供定长切割信号 pneumatic, with stroke switch soleplate, to provide the fixed length cutting signal |
Sample 
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 75 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l ü Specifications and functions of the machine match the content of this contract.
l ü Electrical, mechanical and control systems run smoothly.
l ü Run out sample products as required.
l ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 150USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.