图片展示

MR ALADDIN :   18816899059@163.com

MR AU:                auvuchi@163.com 

0086-18816899059

0086-15018408881

Hello! login Register

OG-SJ65/30 PU tube production line

Interview

Product Detail

OG-SJ65/30 PU tube production line

OTHER OPTION MACHINE

 

 

 

 

Crushing machine

 

 

 


 

 

Single station winding machine

 

 


 

Material mixing machine 100KG

 


 

 

 

Diameter testing machine

 

 

 


 

Double station pipe winding machine

 

 

 


 

 

 

 

PU  coiling  tube machine(semi-auto)

 

 


 

Chiller

5P for one set machine

  


 

Code printing machine

 


 

 

一、 summarize:

1、working condition:380V/3P/50HZ  (can change)

2、material:PU/TPU

3、extruding capacity:about 80kg/h

4. PU tube OD range:6mm—16mm

 

configuration

1、SJ65/30 single screw extruder

Screw barrel          JK 38CrMoAlAelaborate polishing Hard chrome plating

     Nitriding depth                0.5-0.7mm

     Screw hardness                >HV740

     Barrel hardness                >HV940

       L/D                        30:1

     Screw diameter               65mm

     Barrel temperature controlling     7 zones

     Die temperature controlling       3 zones

     Type of cooling               water cooling +air cooling

     Driver motor               AC motor

     Frequency changer            DELTA

     Motor power               30 KW

     Reducer gearbox            hardtooth  surface (hangzhou shuguang)

     model                       200

     ratio                       16:1

     driving type               pulley drive

 

    2. electricial apparatus control system            

     temperature controller        RKC/OMRON         

     contactor                   Siemens

     air switch                   CHINT

 

3. 一,二 level cooling water channel    

material                       A304 stainless teel

     adusting type                  3D adjusting frame

     moving                      screw rod electrodynamic type

     length                         3m

 

4. Three level cooling water channel     A304  double layer stainless steel

adusting type                     2 D  adjusting frame

        length                          5m

                   

   5. dehydration                   220V high pressure air pump  blow-dry machine

haul –off  unit              1.5KW frequency converting control

      flat belt                       34 peak stable foamed ribbed  belt pulley

      height adjustment               Tiptronic adjustment

     

total power                      55kw

mould                          6-16 ( match air pump)

  hopper type dryer                 100kg

 auto loader                       G 300

 

 

FOB Guang Dong China.

- Delivery time: The Seller will hand over the goods to the buyer after 60 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment

- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install

 

Set up :

- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.

Acceptance :

l Equipment that is considered valid must meet the following requirements:

l ü Specifications and functions of the machine match the content of this contract.

l ü Electrical, mechanical and control systems run smoothly.

l ü Run out sample products as required.

l ü Must have a certificate of quality of the place of production and documents attached to the machine.

ARTICLE 2: PAYMENT METHOD

v The buyer makes payment to the seller in 02 times by transfer to the seller's account.

v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.

v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.

ARTICLE 3: WARRANTY

Warranty period: within 12 months from the acceptance date of the equipment.

During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.

(If the device is faulty by the user or is affected by unintended issues such as

Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)

 

ARTICLE 4: BUYER'S LIABILITY

1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,

The buyer is responsible for dropping the item at the buyer's address to the correct location

2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.

3 The buyer pays the seller under Article 4 of this contract.

4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.

5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .

 

ARTICLE 5: SELLER'S LIABILITY

1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.

2 Vendors undertake:

Asian. Ensure time and progress of equipment handover

B. Assurance of quality and content in accordance with agreement requirements.

C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

 


OG-SJ65/30 PU tube production line
Long press to look detail
Long by picture save/share
INQUIRY

在线询盘 MORE+
  • 联系人 *

  • 手机 *

  • 描述

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Inquiry Content:


You have no items to require

Add Successfully
图片展示

© 2025 GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD all rights reserved

Contact us
GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD

Telephone: 020-38912384

Email :

Sales@champion-automation.com

Fax: 020-38912463

Tel: 0086-18816899059, 15018408881

Add:Room 2116,No 101-1 ,Li Xin 12th street, Xin Tang Town, Zeng Cheng District, Guang Zhou, Guang Dong province, China

 

Hotline
0086-18816899059
Office hours
from Monday to Saturday
Qrcode
Scan QR code
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.
粤ICP备2022108158号