Interview
ABS Refrigerator Profile Production Line OG-SJ50/28
Specification Data
1. ZJ200 Vacuum loader
| |
Charging capacity | 200kg/h |
Charging vortex gas pump power | 1.1KW |
2. 50KGS Hopper Dryer
| |
Hopper Volume | 160L |
Fill material capacity | 50kg |
Heating Power | 3.2KW |
Fan Power | 0.23KW |
3.SJ50/28 Single Screw Extruder
| |
Screw and Barrel | Material 38CrMoAlA, nitrided surface hard chrome plated, nitrided layer depth 0.5~0.7mm, surface hardness 800~900HV |
Screw Diameter | Φ50 |
Screw Ratio | 28:1 |
Main Motor Power | 15KW Siemens Beide motor with cooling fan |
Main Motor Timing Method | Adopt 15KW ABB inverter |
Barrel Heating | Stainless steel housing, cast aluminum heater, with fan cooling |
Heating Power | 2.5KW×4 zones |
Gearbox | ZLYJ173 hardened gear reducer, Guomao reducer |
Major appliances | Adopt Omron temperature controller, Siemens contactor, Schneider circuit breaker |
Yield | 30~40kg/h |
Remark | With equipment center height adjustment device Flanges are made according to customer requirements, The main engine and flanges are provided to customers for confirmation before production |
4. Vacuum Calibration Table
| |
Calibration Table Length | 3Meters |
Calibration Table Width | 600MM |
Vacuum Pump | 4KW*1PCS |
Water Pump | 1.5KW*1PCS |
Vacuum and cooling water connections | Vacuum connector = 15pieces (1/2', 4-point); Cooling water connector = 15pieces |
Vortex Air Pump | 0.75KW (used for drying moisture on the board, equipped with 4 flat-mouth plastic tubes) |
Mould Mounting Rail | High quality aluminum alloy with T-slot profile |
Center Distance Of Mold Installation Rail | 180MM |
Calibration Table Moves Forward and Backward | Adopt 0.75KW cycloidal pinwheel reduction motor for adjustment |
Adjustment Of The Calibration Table | Up and down adjustment is by worm gear box and screw rod adjustment Left and right adjustment is by screw rod adjustment Balance adjustment of the shaping table water support is by worm gear box and screw rod adjustment |
5.Belt Haul-off Machine
| |
Haul-off Bracket Length | 1200mm |
Haul-off Motor Power | 0.75KW*2PCS |
Haul-off Speed Adjusting | Adopt 1.5KW ABB Inverter |
Haul-off Speed | 0.5~5meter/min |
Upper And Lower Traction Belt Adjustment Method | Manual adjustment of lead screw |
6.Cutting Machine + 2M Stacker
| |
PLC Control | SIEMENS |
Cylinder | Tracy |
Stacking Rack Length | 2 meters+ |

FOB China
- Delivery time: The Seller will hand over the goods to the buyer after 75 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
1. Equipment that is considered valid must meet the following requirements:
2. ü Specifications and functions of the machine match the content of this contract.
3. ü Electrical, mechanical and control systems run smoothly.
4. ü Run out sample products as required.
5. ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
1. The buyer makes payment to the seller in 02 times by transfer to the seller's account.
2. v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
3. v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 150USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

Copy product links
Long by picture save/share
