图片展示

MR ALADDIN :   18816899059@163.com

MR AU:                auvuchi@163.com 

0086-18816899059

0086-15018408881

Hello! login Register

ABS Refrigerator Profile Production Line OG-SJ50/28

Interview

Product Detail

ABS Refrigerator Profile Production Line OG-SJ50/28

Specification Data

1. ZJ200 Vacuum loader

Charging capacity

200kg/h

Charging vortex gas pump power

1.1KW

 

2. 50KGS Hopper Dryer

 

Hopper Volume

160L

Fill material capacity

50kg

Heating Power

3.2KW

Fan Power

0.23KW

3.SJ50/28 Single Screw Extruder

 

Screw and Barrel

Material 38CrMoAlA, nitrided surface hard chrome plated,

nitrided layer depth 0.5~0.7mm, surface hardness 800~900HV

Screw Diameter

Φ50

Screw Ratio

28:1

Main Motor Power

15KW Siemens Beide motor with cooling fan

Main Motor Timing Method

Adopt 15KW ABB inverter

Barrel Heating

Stainless steel housing, cast aluminum heater,

with fan cooling

Heating Power

2.5KW×4 zones

Gearbox

ZLYJ173 hardened gear reducer, Guomao reducer

Major appliances

Adopt Omron temperature controller, Siemens

 contactor, Schneider circuit breaker

Yield

30~40kg/h

Remark

With equipment center height adjustment device

Flanges are made according to customer

requirements,

The main engine and flanges are provided to

 customers for confirmation before production

4. Vacuum Calibration Table

 

Calibration Table Length

3Meters

Calibration Table Width

600MM

Vacuum Pump

4KW*1PCS

Water Pump

1.5KW*1PCS

Vacuum and cooling water connections

Vacuum connector = 15pieces (1/2', 4-point);

Cooling water connector = 15pieces

Vortex Air Pump

0.75KW (used for drying moisture on the board,

 equipped with 4 flat-mouth plastic tubes)

Mould Mounting Rail

High quality aluminum alloy with T-slot profile

Center Distance Of Mold Installation Rail

180MM

Calibration Table Moves Forward and Backward

Adopt 0.75KW cycloidal pinwheel reduction motor

 for adjustment

Adjustment Of The Calibration Table

Up and down adjustment is by worm gear box and

 screw rod adjustment

Left and right adjustment is by screw rod

adjustment

Balance adjustment of the shaping table water

support is by worm gear box and screw rod

adjustment

5.Belt Haul-off Machine

 

Haul-off Bracket Length

1200mm

Haul-off Motor Power

0.75KW*2PCS

Haul-off Speed Adjusting

Adopt 1.5KW ABB Inverter

Haul-off Speed

0.5~5meter/min

Upper And Lower Traction Belt Adjustment Method

Manual adjustment of lead screw

6.Cutting Machine + 2M Stacker

 

PLC Control

SIEMENS

Cylinder

Tracy

Stacking Rack Length

2 meters+

 

 

 FOB China

- Delivery time: The Seller will hand over the goods to the buyer after 75 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)

- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install

 

Set up :

- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.

Acceptance :

1. Equipment that is considered valid must meet the following requirements:

2. ü Specifications and functions of the machine match the content of this contract.

3. ü Electrical, mechanical and control systems run smoothly.

4. ü Run out sample products as required.

5. ü Must have a certificate of quality of the place of production and documents attached to the machine.

ARTICLE 2: PAYMENT METHOD

1. The buyer makes payment to the seller in 02 times by transfer to the seller's account.

2. v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.

3. v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.

ARTICLE 3: WARRANTY

Warranty period: within 12 months from the acceptance date of the equipment.

During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.

(If the device is faulty by the user or is affected by unintended issues such as

Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)

 

ARTICLE 4: BUYER'S LIABILITY

1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,

The buyer is responsible for dropping the item at the buyer's address to the correct location

2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.

3 The buyer pays the seller under Article 4 of this contract.

4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.

5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 150USD each day .

 

ARTICLE 5: SELLER'S LIABILITY

1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.

2 Vendors undertake:

Asian. Ensure time and progress of equipment handover

B. Assurance of quality and content in accordance with agreement requirements.

C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

 

 


ABS Refrigerator Profile Production Line OG-SJ50/28
Long press to look detail
Long by picture save/share
INQUIRY

在线询盘 MORE+
  • 联系人 *

  • 手机 *

  • 描述

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Inquiry Content:


You have no items to require

Add Successfully
图片展示

© 2025 GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD all rights reserved

Contact us
GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD

Telephone: 020-38912384

Email :

Sales@champion-automation.com

Fax: 020-38912463

Tel: 0086-18816899059, 15018408881

Add:Room 2116,No 101-1 ,Li Xin 12th street, Xin Tang Town, Zeng Cheng District, Guang Zhou, Guang Dong province, China

 

Hotline
0086-18816899059
Office hours
from Monday to Saturday
Qrcode
Scan QR code
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.
粤ICP备2022108158号