Interview
OG-MS9070 正负压三工位热成型机
(五段加热)
OG-MS9070 Three Stations Thermoforming Machine
(with 5 times of heating zones)
(Pictures for reference only)
NO. | Name | MODEL | Quantity (SET) | Unit price (USD) | Total price (USD) |
Main machine | |||||
1 | Three Station Positive and Negative Pressure Thermoforming Machine | OG-MS9070 | 1 | ||
2 | Four Station Positive and Negative Pressure Thermoforming Machine | OG-MS9070
| 1 | ||
TOTAL PRICE: | |||||
Note: | |||||
1) Customer Voltage and Frequency: 380V/50HZ, 3 Phase | |||||
2) Appendix 1: technical data; appendix 2: components brand list | |||||
1. Main Techinacal Parameters
适应片材宽度 (mm) Suitable Sheet Width (mm) | 700-920 |
适应片材厚度 (mm) Suitable Sheet Thickness (mm) | 0.2-1.5 |
最大片材卷径 (mm) Max. Roll Sheet (mm) | 1200 |
成型模具开合行程 (mm) Opening and Closing Schedule of Forming Mould (mm) | 上模170, 下模170 Lower Mold 170, Upper Mold 170 |
模台 Mold plate | QT50铸铁 QT50 cast iron |
立柱 Column | 铬40#钢, 硬度60度, 直径120 Chrome 40# steel, hardness 60 degrees, φ120 |
耗电量 Power Consumption | 60-70KW/H |
耗气量 Gas Consumption | 1 cft/min |
![]() |
最大成型面积 (mm2) Max. Forming Area (mm2) | 900*700 |
成型模具宽度 (mm) Forming Mould Width (mm) | 700-920 |
最大成型深度 (mm) Max. Forming Depth (mm) | 170 |
裁切模具开合行程(mm) Opening and Closing Schedule of Cutting Mould (mm) | 上模170, 下模170 Lower Mold 170, Upper Mold 170 |
最大裁切面积 (mm2) Max. Cutting Area (mm2) | 900*700 |
裁切力 (T) Cutting Force (T) | 100 |
工作效率 (次/ min) Productive (times/min) | Max. 30 |
制品定型冷却 Cooling | 水冷 Water-Cooling |
真空泵 Vacuum Pump | UniverstarXD200 |
使用电源 Power Supply | 3 phase 4line, 380V50Hz |
电热炉加热最大功率 (kw) Max. Heating Power (KW) | 189 |
整机最大功率 (kw) Max. Total Power (KW) | 232 |
最大外形尺寸 (L×W×H) (m) Max. Overall Dimensions (L*W*H) (m) | 14*2.5*2.8 |
![]() |
整机重量 ( T ) Total Weight ( T ) | ≈ 17 |
主机外线铜线 (平方) Main Engine External Copper Wire (mm2) | 50-70 |

二、 机组概述:
2. Machine Composition
2.1 MS正负压高速多工位成型机, 是我司引进德国技术最新研发的 针对于包装工业, 食品工业, 电子 工业的新一代革命性产品, 此系 列应用广泛, 通用性好, 此机型只是其中一款, 针对客户要求, 完 全能为所有产品要求提供满足的设备。
OG-MS9070 Three Stations Thermoforming Machine, it is a new generation evolutionary product for packaging industry, food industry and electronic industry, which is newly developed by our company with German technology. This series of widely used, good versatility, according to customer requirements, can fully be applied to all product requirements.
2.2 MS系列高速成型机均运行在高速、 噪音小, 而且能耗低的环境 下, 它的可靠性、 操作维护方面绝对值得信赖。
MS series high speed forming machines are running at high speed, low noise, and low energy consumption environment, its reliability, operation and maintenance is absolutely reliable.
2.3 速度最高可达到每分钟30个循环的成型机, 绝对称得上高速成型 机。 全部采用绝对式伺服控制系统, 加上先进的自动化系统, 对加工 淀粉降解片材、 光降解片材、 环保片材、 PP、 PS、 PET、 PVC、 高 速成型机都无可挑剔。
MS thermoforming machine with speed up to 30 cycles/min is definitely called high speed thermoforming machine. All adopt absolute servo control system, coupled with advanced automation system, to process starch degradation sheet, photodegradation sheet, environmental protection sheet, PP, PS, PET, PVC, high-speed thermoforming machine are impeccable.
2.4 具备新型设计的模具更换机构, 保证了极短的模具更换时间, 按照人体效学优化设计的简易模具更换系统, 以及钢刀冲切和堆叠装 置, 从而保证了最大的生产时间。
With the new design of mold changing mechanism, to ensure a very short mold replacement time, according to the human efficiency optimization design of the simple mould changing system, as well as the steel knife punching and stacking device, to ensure the Max. production time.
2.5 先进的加热系统, 采用全新的控温模块, 响应快, 时间短, 取得 了低成本, 高效益。
Advanced heating system, using new temperature control module, fast heating time , achieved high efficiency, low cost.
![]() |
三、 功能特点:
3. Features Introduced
3.1 机械、 气动, 电气一体化。 各动作程序由PLC控制。 触摸屏操作, 简单方便。
It is a mechanical-electrical system combined with mechanical, pneumatic, electrical integration. PLC programming, touching screen, operation simple.
3.2 正负压成型。
Positive and negative pressure forming.
3.3 五支点上、 下模成型方式。
Five fulcrum structure, upper and lower mould forming method.
3.4 伺服拉伸。
Stretching Servo.
3.5 伺服送片, 长度无级调整, 高速准确稳定。
Feeding Servo, Length stepless adjustment, high speed, accurate and stable.
3.6 上、 下电热炉五段加热。
Upper and lower electric heating furnace with 5 times of heating zones.
3.7 电热炉控温系统采用全电脑智能自动补偿控制, 具有微调精度高, 温度均匀, 稳定不受外部电压影响, 能耗低 (节能15%左右), 炉板 使用寿命长等优点(采用新温控系统后能再节能8%, 合计能节能20%- 23%)。
The temperature control system of electric heating furnace adopts computer intelligent automatic compensation control, which has the advantages of high
precision of fine tuning, uniform temperature, stable and not affected by
external voltage, low energy consumption (about 15% energy saving), long service life of furnace plate and so on. (New temperature
control system: Electric saving device, after adopting the new temperature control system, the energy can be saved by 8%, and the total energy can be saved by 20%-23%).
3.8 成型、 裁切单元开模、 合模伺服电机控制, 制品自动计数输出。
Forming, mould opening of cutting, mould closing is controlled by servo motor, and products are automatic counting output.
3.9 制品向下垒叠方式。
Products are stacked downward.
3. 10 具有产品资料及参数档案记忆功能。
With product data and parameter file memory function.
3.11 送片链轨宽度可同步自动或分立电动调整。
The width of the feed chain rail can be adjusted synchronously automatically or separately electrically.
3.12 电热炉自动移出装置。
Electric heating furnace automatic removal device.
3. 13 机械上料卷装置, 减轻工人劳动强度。
Mechanical loading and winding device, reduce the labor intensity of workers.
![]() |
4. 主要电气元器件品牌
Major Brand of Electrical Components
可编程逻辑控制器( PLC ) PLC | 台达 Delta |
触摸屏12寸 12 ' Touch Screen | 台达 Delta |
送片伺服电机 (4.5kw) Feeding Servo (4.5kw) |
台达 Delta |
成型下模伺服电机(4.5kw) 带刹车 Lower Mold Forming Servo Motor (4.5kw) with Brake |
台达 Delta |
拉伸伺服 (4.5KW) 带刹车 Stretching Servo (4.5kw) with Brake | 台达 Delta |
成型上模伺服电机(4.5Kw) 带刹车 Upper Mold Forming Servo Motor (4.5kw) with Brake | 台达 Delta |
裁切下模伺服电机 (5.5Kw) 带刹车 Lower Mold Cutting Servo Motor (5.5kw) with Brake | 台达 Delta |
裁切上模伺服电机 (11Kw) 带刹车 Upper Mold Cutting Servo Motor (11kw) with Brake | 台达 Delta |
堆叠伺服电机 (3Kw) 带刹车 Stacking Servo Motor (3kw) with Brake | 台达 Delta |
炉板(448块)电炉长度3.5米 448 pcs of Heating Zones, Electric Furnace Length of 3.5 meters | TRIMBLE |
减速机 Reduction box | 强珠 WPWK |
交流接触器 A.C. Contactor | 施耐德 French Schneider |
热继电器 Hot Relay | 施耐德 French Schneider |
固态继电器 Auxiliary Relay | 欧姆龙 Japanese Omron |
空气开关 | 德力西 |
Air Swicth | DELIXI |
气动元件 Pneumatic Component | SMC.亚德客 SMC. AirTAC |
气缸 Air Cylinder | 志诚 Chinese Zhicheng |
成型阀(正压) Molding valve (positive pressure) | MAC, 1 inch |
成型阀(负压) Molding valve (negative pressure) | SAC, 1 inch |
![]() |
5. 随机配件
Standard Equipment with Machine
600w电热瓦 ( 2线 ) 600w Electric Heating Zone (2 wires) | 4 pcs |
600w电热瓦 (4线) 600w Electric Heating Zone (4 wires) | 2 pcs |
继电器 Intermediate Relay | 2 pcs |
40A固态器 40A Solid-state Relay | 4 pcs |
75A固态器 75A Solid-state Relay | 2 pcs |
接近开关 Approach Switch | 2 pcs |
机器操作说明书 | 1 pc |
Machine Operating Instruction | |
工具箱 Tool Case | 1 pc |
Hand Refueling Gun | 1 pc |

FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 75 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l ü Specifications and functions of the machine match the content of this contract.
l ü Electrical, mechanical and control systems run smoothly.
l ü Run out sample products as required.
l ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
6.1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
6.2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
6.3 The buyer pays the seller under Article 4 of this contract.
6.4 The expenses such as as airplane, visa, travel expenses,other expenses for foreign engineers in china will be paid by the Seller.
6.5 The Other expenses such as pick up and see off ,dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 150USD each day .
ARTICLE 5: SELLER'S LIABILITY
7.1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
7.2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

Copy product links
Long by picture save/share
