Interview
Quotation of OG-75- PE Fruit Net and Pipe Extrusion Line
No. | Equipment | Q’ty | Price |
1. | OG-75 PE Fruit Net and Pipe Extrusion Line | 1 Set | |
Total Amount CIF VIET NAM PORT Price | |||
Ⅰ.General Information:
1、Raw material: LDPE, GMS(Glycerol monostearate), talc;butane gas.
2、Extruder capacity: 0.55G≥60000pcs/h 0.8---0.9G≧35000pcs/h
3、Production line speed: 10-60m/min
4、Three shifts per day, 2 persons for each shift.
5、Installed power: 41kw
6、Power Supply: 380V, 50HZ, 3Phase
Ⅱ.List of major system
No. | Name | Q’ty |
1 | Steel rack structure | 1 set |
2. | Extruding Unit | 1 set |
3. | Foaming agent injecting Unit | 1 set |
4. | Anti-contractor injecting unit | 1 set |
5. | Foaming mold –head unit | 1 set |
6. | Automatic replacing net device system | 1 set |
7. | Haul-off and cutting unit | 1 set |
8. | Auto control unit | 1 set |
9. | Cutting unit for the pipes | 1set |

Ⅲ.Detailed technical data:
Item | Name | Data | Quantity |
1-Steel rack structure | operation table of ingredient | ss41 made of steel
| 1set |
Hopper
| *capacity 250 kg/hr *hopper coniform *driving motor 1set 2HP ×4P | ||
2-Extruding Unit | 1-Deceleration box | *model helical gear without pole *material FCD25 forgeable lion *box body FC 20 *gear wheel SCM4 special gear wheel, Polished and heated *motor AC11KW×4P Equipped with the transducer | 1set |
2-Neck | *model Cooling water set *material FCD25 (able to forge steel) | ||
3-Barrel | *diameter ∮75×∮140mm *material 38CrMoAl *heating area 10 sets *method of heating iron heating *method of cooling cycle water *diameter ∮75 (L/D-55:1) *MATERIAL 38CrMoAl *compression ratio 3:1 *rotating speed 0-60 r/min | ||
4-Screw | *Screw diameter ∮105 (L/D-55:1)) *Material: 38CrMoALA nitride steel HV900 *compression ratio 3:1 *rotating speed 0-60 r/m | ||
3-Foaming agent injecting Unit | *forming agent butagas in liquid state *pump high pressure metering pump *output pressure highest Max 50MPa *output regulation regulate the itinerary of piston *power 2.2kw *process control graduate hand wheel *driving motor by pump 2HP ×4P×1set | 1set | |
4-Anti-shrinking injection unit | Distilled Glycerin Monostearate
| *anti-shrinking M-1, Distilled Glycerin Monostearate *pump high pressure measure pump, double pillarw piston *the range of measurement 35-245CC/min *volume of melting-pot 5-7L *driving motor by pump 1.5kw×4P | 1set |
5- Foaming mold head unit | round mold head for expanding | *Type round mold head for expanding *material 38CrMoAl *heating region 1zone *heating method electricity heater | 1set |
6-Auto net changing system | *heating area 3 zones
| 1set | |
7-Haul-off and cutting unit | *Haul-off motor : 0.75kw * Cutting unit motor : 0.75kw | 1set | |
8-Auto control unit | 1-temperature control | *squeezing engine 10 zones *mold head heating alone | 1set |
2- driving motor control | *squeezing engine AC motor control cabinet *parts of haul and rolling control | ||
9-Cutting Unit | *conveyor *Cutting | 1set |
Ⅳ. Spare parts list:
No. | Name | Q’ty | Remarks |
1. | Butane pump connection with connecting set | 1 set | |
2. | special tools for taking spiral stick apart | 1 set | |
3. | stainless steel net | 1 m2 | |
4 | filler | 1 pc | |
5. | Mould head heater | 1set | |
6. | Thermocouple | 2pcs |
Ⅴ.Machine pic:
Material loading |
| Cooling | |
Foaming Head |
| Auto Cutting |
|
GMS Pump | | Butane pump |
|
Hauling off |
| Cabinet |
|
Screen changer |
| Cutting unit |
|
| |||
Ⅵ.Consumption:
We take 1 ton LDPE as the sample.
No. | Item | Consumption | Remarks |
1 | LDPE | 1ton | 1ton LDPE could working continuously 36 hours. |
2 | GMS(Glycerol monostearate) | 30kg | Anti shrinkage effect |
3 | Talc | 3-5kg | Adjusting density effcect |
4 | Butane gas | 200kg | Foaming |
5 | Electricity | 11-14kw/hr | Working eomsumption |
6 | Water | 100kg/hr |
Ⅶ. Equipment need to be prepared by customers
1. Buyer is responsible to guarantee the power and water supply to make sure equipments and controlling cabinets can work normally.
2. All necessary craft pipelines (if you can provide your factory area, we can collocate the all pipelines free of charge) and valve, electric wires, cable, wire slots, bracket and so on.
Ⅷ.Quotation:
1. Payment terms: 40%TT down payment and the balance paid before delivery.
2. The seller will arrange 1 engineers to install&test the machine and train the buyer’s engineers .The buyer should bear all the charges includes the domestic & oversea round air ticket,hotel ,visa and all the expenses in the buyer’s country .The buyer should pay each engineer USD60.00/day .
3. Delivery time: Within 20 days after getting the down payment.
4. . Package: Export standard package –steel iron frame.
5. Guaranty period: One year guaranty for the machine and 6 months for the electrial appliance.
6. Delivery: 1x20’container
7. Validity: 30 days
XI.Finished product


Copy product links
Long by picture save/share
